It was pretty cool to watch the steeple slowly be lifted by the crane. Gavin and I were trying to guess how heavy it was. At least as much as an elephant we decided. :)
As the steeple got higher there were workers waiting to make sure it was exactly in the proper place. The first time they set it on it wasn't quite right so they had to lift it and try once more. Finally it was perfect. I'm not sure what was used to get it to stick. That was the other thing we were wondering. Was it cement? Super glue? Nails? We're still not sure. :)
We were told the steeple was going to go up at 10 in the morning. At 9:45 I looked out the window and saw it was already attached to the crane so Gavin and I hurried out. Unfortunately, everyone else from the neighborhood showed up at 10 only to find the steeple already on the church. I guess that's an advantage to be right across the street! Now I guess Gavin can check off "see something be lifted with a crane onto a building" from his bucket list. What a fun moment to share with my cute little guy. :)
